Refurbished Lände Brigittenau II completed – More safety and sustainability for the Danube waterway in Vienna
The new shipping pier is another important modernization success for freight shipping on the Danube, where climate- and noise-friendly shore power systems are now available in Vienna for the first time. The Lände Brigittenau II was built as part of the “FAIRway works!” project. in the Rhine-Danube Corridor” co-financed by the EU. Together with the Climate Protection Ministry (BMK), the EU Commission representation in Vienna and viadonau, the completely renovated Lände will be inaugurated in the federal capital on August 27th.
When: Tuesday, August 27th, 10:30 a.m. – 12:00 p.m
Where: Lände Brigittenau II, 1200 Vienna (between Nordbrücke and Floridsdorfer Brücke): Google maps https://maps.app.goo.gl/6mhNd9Fffngzwcs97
10.15 Arrive at the bastion
10.30 Statements by Climate Protection Minister Leonore GewesslerHead of the EU Commission Representation in Austria Wolfgang Bogensbergerviadonau managing director Hans-Peter Hasenbichler
10.45 Tour of the new ship pier and the shore power systems (including photo opportunity)
11.15 End at buffet
We recommend traveling by public transport (e.g. U6 Handelskai station & a 10-minute walk).
Please send your RSVP by August 26th to cornelia.tollhammer@viadonau.org.
Invitation to a press conference with Climate Protection Minister Gewessler on the occasion of the opening of the Vienna Brigittenau Shipping Lands on August 27th.
Datum: August 27, 2024, 10:30 a.m
Art: Pressetermine
Ort: Lands of Brigittenau II
1200 Wien
Austria
URL: https://maps.app.goo.gl/6mhNd9Fffngzwcs97
OTS ORIGINAL TEXT PRESS RELEASE UNDER THE EXCLUSIVE RESPONSIBILITY OF THE SENDER FOR CONTENT – WWW.OTS.AT | VIA