Invitation Media appointment construction progress new connection Leoben
Vienna (OTS) –

APG, together with EnergieSetze Styria and Voestalpine AG, invites you to a media appointment for the current construction progress in the energy management playmaker “New connection Leoben” a.

Date: July 9, 2025, 10:30 a.m. Location: Leoben, Haldenstraße 1, 8700 Leoben

The “New Connection Leoben” project enables the supply -proof energy transition in the region and is a prerequisite for the electricity -based steel production of Voestalpine AG in Donawitz. The project thus contributes significantly to strengthening the economic and industrial location. The project has been implemented since April 2024. The measures include around seven kilometers of management work, the expansion of the Hessenberg substation and the construction of the Leoben substation.

Your interlocutors are at the appointment:

· Di Mag. (FH) Gerhard Christiner, board spokesman APG

· Di (FH) Mag. (FH) Martin Graf, Board Director of Energie Styria

· Di Dr. Franz Kainersdorfer, member of the Board of Directors Voestalpine AG & Head of Metal Engineering Division

· DI Gerald Deutschmann, President of State Parliament Styria (in representation for the Styrian governor Mario Kunasek)

More details and one Travel schedule Please refer to the invitation.

We look forward to welcoming you to the appointment and asking for registration by July 7, 2025 at Stefan.Walehrach@apg.at and please also at wolfgang.groeger@apg.at.

Media appointment construction progress new connection Leoben

Datum: 07.07.2025, 10:30 a.m.

Art: Press and

Ort: Leoben substation

Haldenstraße 1

8700 Leoben

Austria

OTS original text press release with the exclusive in terms of content of the sender – www.ots.at | Apg

hongkong pools

keluaran sdy

togel hongkong

togel hari ini

By adminn