Due to construction work from the night from 02.02.2025 to 03.02.2025 until the end of 2027, the extremely right lane of Lorrainerstrasse 1-5 will be blocked.
Details of the traffic measures:
The construction work takes place when the extremely right lane is locked. This traffic measure will be set up on Monday, 03.02.2025 from Sunday, 02.02.2025. There are 2 lanes in Lorraine Road in the construction site area for vehicle traffic.
- Establishment of the traffic measure: night from 02.02.2025 to 03.02.2025
- Planned construction end: at the end of 2027
Further information is available on wien.gv.at/verkehr/baustellen Or also under +43 1 955 59 – Infoline Straße and Transport.
City of Vienna – Transport Organization and Technical
Traffic matters
Public relations
Ilona Hadasch
Telephone: +43 1 4000-92703, +43 676 8118 92703
E-mail: ilona.hadasch@wien.gv.at
OTS original text press release with the exclusive in terms of content of the sender – www.ots.at | NRK