Shanghai Electric: Energy storage UK marks new milestones

London (ots/PRNewswire) Shanghai Electric (SEHK:2727, SSE:601727) announced that the 100 MW/100 MWh energy storage station REP1&2 in the United Kingdom (“REP1&2”) – the Company’s first large-scale energy storage project overseas – has entered commercial operation. Another milestone is the grid connection of the Fiskerton II-A solar project (“Fiskerton II-A”), the last of the eight solar projects in the UK.

  • The 100MW/100MWh REP1&2 energy storage station project in Kent has entered commercial operation
  • The final project under construction, Fiskerton II-A, in a series of eight solar projects in Lincolnshire, has come online

The two projects will be built in the east and south-east of England, where electricity demand is high during the coldest times of the year according to statistics from the Statista Research Department is one of the highest in the country. Once fully operational, the new facilities will help increase the region’s grid capacity during periods of high demand.

The REP1&2 Project in Kent is equipped with high-performance lithium iron phosphate batteries manufactured at Gotion New Energy’s production site in Nantong. The project was developed by Pacific Green and acquired earlier this year by a subsidiary of Generali, Italy’s largest and third largest insurance company in the world. With Shell Energy Europe Limited as operator, the project aims to improve the efficiency, reliability and sustainability of the UK’s electricity system.

Shanghai Electric supplied a complete set of energy storage solutions, including 38 battery and 20 PCS containers. The completion of the project marks a significant step for Shanghai Electric in expanding its presence in the global energy storage market.

The successful network connection of the Projekts Fiskerton II-A in Lincolnshire is the culmination of a series of eight solar projects in the UK led by Shanghai Electric. This strengthens the company’s position as an innovation leader in the solar sector, driving the development of groundbreaking and sustainable solutions to meet the increasing global demand for renewable energy sources.

“Shanghai Electric’s eight solar projects in Lincolnshire will generate 128,117 MWh of renewable electricity annually. These are also Shanghai Electric’s first projects abroad, where the company is responsible for the investment, financing, construction, grid connection and operation of the solar system. “This underscores Shanghai Electric’s comprehensive capabilities in providing cutting-edge solar solutions that require ground-breaking, high-efficiency and long-lasting solar products,” said Stuart Mellor, Fiskerton II-A project manager.

Timeline of the eight solar projects:

  • West Holcombe in Shillingford: Grid connection in January 2022
  • Bishop’s Waltham in Winchester: Grid connection in June 2022
  • Outwood in Billericay and Ingham in Bury St Edmunds: Grid connection in July 2022
  • Trowse Newton in Norwich: Grid connection in August 2022
  • Sweeting Thorns in Scunthorpe: Grid connection in January 2023
  • Low Farm in Grimsby: Grid connection in April 2023
  • Fiskerton II-A in Lincolnshire: Grid connection in December 2023

Photo – https://mma.prnewswire.com/media/2310315/Image1.jpg

Logo – https://mma.prnewswire.com/media/1800747/logo_new_Logo.jpg

View original content:https://www.prnewswire.com/news-releases/shanghai-electric-energiespeicher–und-fotovoltaik-projekte-in-groWbritannien-markieren-neue-meilensteine-302026698.html

Questions & Contact:

Jin Shen,
+86(21)33261246,
Email: shenjin@shanghai-electric.com

slot demo

slot deposit dana

rtp live

rtp live

By adminn