mythics.azura.idevice.co.id

22nd district: Rautenweg – road construction work for the construction of bus stops on line 28A | City vienna

22nd district: Rautenweg – road construction work for the construction of bus stops on line 28A |  City vienna
Vienna (OTS) –

On Tuesday, July 30, 2024, the City of Vienna – Road Administration and Road Construction will begin work on the construction of bus stops for line 28A on Rautenweg in the Percostraße area to Hermann-Gebauer-Straße in the 22nd district.

Details and traffic measures

Rautenweg in front of house number 43/Percostraße

During the work, it is not possible to turn from Rautenweg into Percostraße in the direction of Wagramer Straße. One lane will be kept clear for traffic on Rautenweg.

Rautenweg in front of house number 53/Hermann-Gebauer-Straße

During the work, two lanes in the direction of Wagramer Straße will be kept free for traffic, with all driving directions available to traffic.

Rautenweg in front of house number 88/Schillingstrasse

In the direction of S2 Wiener Nordrand Expressway (A23), three lanes will be kept free for traffic during the work, with all travel routes available to traffic.

  • Location of the construction site: Rautenweg in the area of ​​Percostraße to Hermann-Gebauer-Straße
  • Construction start: July 30, 2024
  • Planned end of construction: August 30, 2024

Further information can be found at wien.gv.at/verkehr/strassen and wien.gv.at/verkehr/baustellen or at +43 1 955 59 – Infoline Road and Traffic.

OTS ORIGINAL TEXT PRESS RELEASE UNDER THE EXCLUSIVE RESPONSIBILITY OF THE SENDER FOR CONTENT – WWW.OTS.AT | NRK

rtp slot pragmatic

link slot demo

rtp slot gacor

slot demo

Exit mobile version